Your roof, from the first check to the handover

You have one contract partner, including for repairs and maintenance afterwards. Free State AG handles your roof renovation across Switzerland with its own teams.

What does a roof like yours cost?

Choose your address from the list.

Enter your address. We read the area, roof shape and building year from federal data and show you the result. We do not need your contact details for this.

Aerial photo of a flat roof on a commercial building, outline markedExample
  • 2'081 m²
  • Flat roof
  • Built 1985

Our price per m² for the complete rebuild

CHF 260 to 415 per m² incl. 8.1 % VAT

Aerial image: swisstopo, SWISSIMAGE
  • Written quote
  • Fixed price after the site visit
  • One contract
Prefer to ask us directly
Old, weathered tile roofs in a historic town centre

Typical service life

Tile and fibre cement50 years
Flat roof30 years

These signs call for a check

You can see many of them yourself, from the attic or from the street.

  • Water stains on the ceiling or damp in the attic.
  • Broken, shifted or missing tiles.
  • Cracks or blisters in a flat roof's waterproofing, or standing water after rain.
  • Rust or open spots on gutters, flashings and joints.
  • Rooms under the roof that get cold in winter and overheat in summer.

What about age?

The Swiss joint lifespan table (paritätische Lebensdauertabelle) gives a guide value of 50 years for tile and fibre cement roofs and 30 years for flat roofs. Age alone does not decide.

Flat roofs usually do not last as long as pitched roofs. In an article of 8 August 2024 for the homeowners' association HEV Schweiz, the trade body Gebäudehülle Schweiz advises having a flat roof older than ten years checked before a solar system is mounted.

The whole roof, one contract

You deal with Free State AG, from the first check until after the handover. Our own teams carry out the work.

  • We put a new covering on your pitched roof, including the underlay.

    With fibre cement we check for asbestos before the quote and list the removal separately.

Before work starts

Check
We inspect the covering, underlay, insulation and joints on site and tell you what is needed.
Quote
You receive a written quote with area, build-up and price that you can show your bank or property manager.
Permit and subsidy
We clarify whether a building permit is needed and handle the subsidy application, which must be filed before work starts.

On site

Scaffold
We put up the scaffold and fall protection and set up the site.
Hall roof
We renovate large roofs on commercial and industrial halls and plan the stages with your operations.

Handover and after

Handover
At the end we inspect and hand over the roof together with you. The warranty period starts on that day.
Repairs and maintenance
After the handover we remain your point of contact for repairs and maintenance.

What a roof renovation costs

The price depends on a few things. We show them openly, together with public federal figures.

What subsidised roof renovations with insulation have cost in Switzerland

2023 to 2025

Middle half of projectsMedian

Source: Swiss Federal Office of Energy, Buildings Programme (Das Gebäudeprogramm), raw data. Total investment per case, which may include other work. VAT not stated in the source.

What subsidised roof renovations with insulation have cost in Switzerland
BuildingLower quartileMedianUpper quartileCases
Single-family homeCHF 45'800CHF 69'400CHF 102'0002'444
Multi-family buildingCHF 71'000CHF 111'400CHF 185'3001'690
IndustryCHF 102'300CHF 219'000CHF 420'000204

Our price for large flat roofs

CHF 260 to 415

per m² incl. 8.1 % VAT

Complete rebuild of a flat roof of 1'000 to 2'999 m²

Scaffold and fall protection depending on the building, planning and site management, and old roofing containing tar come on top. This is not a quote.

We only quote a new covering without insulation after the site visit. The calculator shows no price for it.

What sets the price

Fixed costs

Scaffold and site costs apply even to a small roof. That is why a small roof costs more per m² than a large one.

Size

Materials and labour grow with the roof area.

Build-up

A new covering with underlay and insulation costs more than replacing the covering alone.

Access

Tall buildings, narrow access and complex roofs need more scaffold and more time.

Three stages to a fixed price

  1. OrientationThe calculator shows public values for your building, starting from your address. This is not a quote.
  2. Indicative quoteWhere the roof allows it, you receive a written indicative quote after our call, itemised with area, build-up and price. Asbestos and the condition of the roof have not been checked at that point.
  3. Fixed priceAfter the site visit you receive a fixed price, which goes into the contract as it stands. Asbestos and damage to the roof structure are listed separately.

What the cantons pay and what changes for tax

Rates differ from canton to canton. The table shows five examples, as of 2026. We check the amount for your canton in the quote.

ZurichCHF 40per m² of insulated areaSolar add-onCHF 20 per m²
SchaffhausenCHF 50per m² of insulated areaSolar add-onCHF 30 per m²
ThurgauCHF 40per m² of insulated areaSolar add-onCHF 20 per m²
St. GallenCHF 40per m² of insulated areaSolar add-onGrant only with a solar system
AargauCHF 40per m² of insulated areaSolar add-onCHF 20 to 100 per m², depending on roof and system

The grant applies only with insulation and a U-value of at most 0.20 W/m²K. The application must be filed before work starts. In these five cantons the building permit must date from before 2000. The programmes set further conditions, for example a cap of 50 percent of the cost or, from a grant of CHF 10'000, a building energy certificate with advisory report (GEAK Plus).

The insulation amount applies per m² of insulated roof. The solar add-on applies per m² of module area in Zurich and per m² of insulation in Schaffhausen and Thurgau, where it is capped at CHF 50'000. In Aargau the bonus has its own conditions, for example greening on a flat roof.

Tax from 2029

01.01.2029

From 1 January 2029 the deduction for property maintenance ends for owner-occupied homes, at federal, cantonal and municipal level. The imputed rental value ends at the same time.

The deduction remains for rented or leased residential property.

It is best to ask your tax office which date counts for your work.

Source: Swiss Federal Council, press release of 1 April 2026.

Plan solar at the same time

When the roof is renewed, a solar system can share the scaffold and the building phase. Whether and when you want solar is up to you.

  • One scaffold, one building phase
  • A new roof under the system
  • Asbestos cement first
Plan roof and solar together
Installer carrying a solar module along the ridge of a tile roof with scaffolding

Six steps to a new roof

Roofer on a tile roof behind a scaffold with safety net
  1. 1

    Request

    You send us your name, phone number and address, with or without the calculator.

  2. 2

    Callback

    We call you and clarify what your roof needs. Where the roof allows it, we then send you a written indicative quote.

  3. 3

    Site visit

    We look at the roof on site and check the covering, underlay and insulation.

  4. 4

    Quote with fixed price

    You receive a written quote with area, build-up and fixed price.

  5. 5

    Subsidy and permit

    We show you which programme applies in your canton, handle the subsidy application before work starts and clarify whether a building permit is needed.

  6. 6

    Work and handover

    Our teams carry out the work. At the end we hand over the roof together with you.

What the contract says

One contract

Your contract is with Free State AG, for all work on the roof.

Safety on site

We write the safety measures into the contract, as the Construction Work Ordinance provides (BauAV Art. 3).

Warranty

A warranty of five years from handover applies to defects, as the law provides for buildings. You have 60 days to notify a defect, and for hidden defects the 60 days run from discovery (Swiss Code of Obligations, Art. 367, 370 and 371).

Asbestos cement

For fibre cement on buildings up to construction year 1990 we check for asbestos before the quote. We list the removal separately in the quote.

Frequently asked questions

Questions about roof renovation

Where we can only judge something on site, we say so.

According to the raw data of the Buildings Programme (Swiss Federal Office of Energy), subsidised roof renovations with insulation on single-family homes in Switzerland had a median cost of CHF 69'400 per case from 2023 to 2025. The lower quartile was CHF 45'800, the upper quartile CHF 102'000. These totals may include other work, and the source does not state VAT. Our calculator shows you these public values for your building. You receive the fixed price after the site visit.

Signs include water stains, broken or shifted tiles and damaged waterproofing. The Swiss joint lifespan table gives a guide value of 50 years for tile and fibre cement roofs and 30 years for flat roofs. Age alone does not decide, which is why we look at the roof.

That depends on the condition of the covering, underlay and insulation. According to the trade body Gebäudehülle Schweiz, the tiles themselves can last up to 100 years, so a renovation often concerns the layers beneath them. We tell you whether a repair is enough after the site visit.

That depends on the area, the build-up and the weather. We clarify the duration at the site visit.

We clarify this at the site visit, because it depends on the build-up and the condition of the roof.

That depends on the canton, the zone and the scope of the work. We clarify it for your roof and handle the application if one is needed.

Cantonal programmes pay an amount per m² for insulation, for example CHF 40 in Zurich and CHF 50 in Schaffhausen, as of 2026. The application must be filed before work starts. We clarify the amount for your canton in the quote.

From 1 January 2029 the deduction for property maintenance ends for owner-occupied homes, and the imputed rental value ends at the same time. The deduction remains for rented or leased residential property. It is best to ask your tax office which date counts for your work.

Asbestos has been banned in Switzerland since 1990, and asbestos fibre cement sheets could still be placed on the market until 1 January 1991. So for fibre cement on buildings up to construction year 1990 we check for asbestos before the quote. The sheets must not be sawn or broken and must not be reused. We list the removal separately.

We take it off for the work and put it back on afterwards. We quote this separately. We clarify at the site visit whether the system can go back on unchanged.

Let us talk about your roof

Your name, phone number and address are enough. We call you and clarify the details of your roof.